Product Description

Basic information

Type Compound   Exhaust Valve Media Ductile Iron
Certification CE, ISO9001,BV Big and Old   Valve Facotry 65 Production   History
Size DN200 OEM&ODM Customer   Request
Coating Epoxy Pressure PN16
Design   Standard En1074-4 Applicable   Size DN25-DN300
Valve Body Casting Standard API609/DIN3354/BS5155/En593
Body Material Ductile   Iron/Wcb/Stainless Steel Packing Export Plywood   Box
Testing 100%   Inspections Before Leaving Factory Warranty 18 Monthes
Transport   Package Export Plywood   Box Trademark TWT

 

Product Description

Twt Factory Supply Ggg50 DN200 Pn10 Air Release Valve

The features of exhaust air relief valve
1.Exhaust process more smoothly
steady air release can avoid pressure surge and protect pipline damage

2.More autonomous working mode
The air relief valve can release air when filling water in pipe,enter air to get rid of negative pressure when vacuum or negative pressure exists

3.More reliable way of discharge
Quick released air and air with water will not close valve orifice in advance and cause air seal,Orifice will close when air is released completely

4.Automatic protection safer performance
Whenever if system pressure is lower than atmosphere ,water column happened,the air relief valve will open immmediately and air will enter system to get rid of negative pressure,at the same time,entering air can speed up the speed of air release during air release

Product Parameters

TWT Exhaust air relief valve can be devided in to
High speed compound air release valve
Slow closing inlet and outlet air relief valve

Size:DN25-DN300
Pressure:PN1.0-1.6Mpa
Temp:0ºC-90ºC
Main materials:cast iron,ductile iron,stainless steel
Connection type:Thread,Flang

Inspection and maintenance program

Close cut-off valve under air release valve
Take off the connection bolts between valve body and cover use water to clear floaing ball ,body,cover,sealing ring and creen
The floating ball is put back in place,install the valve cover,tighten the bolts
Open the cut-off valve

Installation and maintenance

Valve should be installed vertically in the pipeline highest point
The cut-off valve(butterfly valve or gate valve) should be installed before air release valve
Check and maintenance is recommened for one or two times in one year,the work can increase according to water condition

Main materials

Screen cover SS304/SS316
Screen Stainless steel
Sealing NBR/EPDM
Retainer Stainless steel
Float ball Stainless steel
Cushion NBR/EPDM
Guide pin Stainless steel
Body Ductile iron/WCB/Stainless steel
Cover Ductile iron
Gasket NBR/EPDM
Leverage bracket Stainless steel
Air-vent Stainless steel/brass
Floating ball lever Stainless steel
Connectiontube Stainless steel

 

Certification

 

Our Advantages

• More than 60 years of valve production experience
• with advanced processing equipment
• large testing laboratories
• and sufficient raw material reserves

FAQ

Q1.Whether it is a factory?
A:yes we are valve manufacture since 1956 have more than 60 years valve production experience
Q2.Can i have any own customized product?
A:yes you are customized requirements for standard,size,colour,packing,nameplate,mark,etc
Q3.Do you provide samples?
A:yes we can provide the samples but do not pay the charge of freight
Q4.What’s your terms of payment?
A:30% in advance 70% balance before shipment
Q5.Is there any testing equipment
A:Yes, we have pressure testing equipment, and large-scale laboratories and non-destructive testing equipment