Twt Factory Supply Ggg50 DN200 PN10 Válvula de liberación de aire

Tipo

Compound Exhaust Valve

Presión

PN16

Embalaje

Export Plywood Box

Garantía

18 Meses

Descripción del Producto

Información básica

TipoCompound Exhaust ValveMedios de comunicaciónHierro dúctil
CertificaciónCE, ISO 9001,BVBig and Old Valve Facotry65 Historial de producción
TamañoDN200OEM&ODMSolicitud del cliente
Revestimiento EpoxyPresión PN16
Design StandardEn1074-4Tamaño aplicableDN25-DN300
Cuerpo de la válvulaFundiciónEstándarAPI609/DIN3354/BS5155/En593
Cuerpo materialDuctile Iron/Wcb/Stainless SteelEmbalajeCaja de madera contrachapada de exportación
Testing100% Inspections Before Leaving FactoryGarantía18 Meses
Paquete de transporteCaja de madera contrachapada de exportaciónMarca comercialTWT

 

Descripción del Producto

Twt Factory Supply Ggg50 DN200 Pn10 Air Release Valve

The features of exhaust air relief valve
1.Exhaust process more smoothly
steady air release can avoid pressure surge and protect pipline damage

2.More autonomous working mode
The air relief valve can release air when filling water in pipe,enter air to get rid of negative pressure when vacuum or negative pressure exists

3.More reliable way of discharge
Quick released air and air with water will not close valve orifice in advance and cause air seal,Orifice will close when air is released completely

4.Automatic protection safer performance
Whenever if system pressure is lower than atmosphere ,water column happened,the air relief valve will open immmediately and air will enter system to get rid of negative pressure,at the same time,entering air can speed up the speed of air release during air release

Parametros del producto

TWT Exhaust air relief valve can be devided in to
High speed compound air release valve
Slow closing inlet and outlet air relief valve

Tamaño:DN25-DN300
Presión:PN1.0-1.6Mpa
Temperatura:0ºC-90ºC
Main materials:cast iron,hierro dúctil,acero inoxidable
Connection type:Hilo,Flang

Inspection and maintenance program

Close cut-off valve under air release valve
Take off the connection bolts between valve body and cover use water to clear floaing ball ,body,cover,sealing ring and creen
The floating ball is put back in place,install the valve cover,tighten the bolts
Open the cut-off valve

Installation and maintenance

Valve should be installed vertically in the pipeline highest point
The cut-off valve(butterfly valve or gate valve) should be installed before air release valve
Check and maintenance is recommened for one or two times in one year,the work can increase according to water condition

Main materials

Screen coverSS304/SS316
ScreenAcero inoxidable
SealingNBR/EPDM
RetainerAcero inoxidable
Float ballAcero inoxidable
CushionNBR/EPDM
Guide pinAcero inoxidable
CuerpoDuctile iron/WCB/Stainless steel
CoverHierro dúctil
GasketNBR/EPDM
Leverage bracketAcero inoxidable
Air-ventStainless steel/brass
Floating ball leverAcero inoxidable
ConnectiontubeAcero inoxidable

 

Certificación

 

Nuestras ventajas

• Más que 60 años de experiencia en la producción de válvulas
• con equipo de procesamiento avanzado
• grandes laboratorios de pruebas
• y suficientes reservas de materia prima

Preguntas más frecuentes

Q1.Si es una fábrica?
A:sí, somos fabricantes de válvulas desde 1956 tener más de 60 años de experiencia en la producción de válvulas
Q2.¿Puedo tener algún producto personalizado??
A:sí, usted es requisitos personalizados para el estándar,tamaño,color,embalaje,Placa de nombre,marca,etc.
Q3.¿Proporciona muestras?
A:Sí, podemos proporcionar las muestras, pero no pagamos el costo del flete.
Q4.¿Cuáles son sus condiciones de pago??
A:30% por adelantado 70% saldo antes del envío
P5.¿Hay algún equipo de prueba?
A:Sí, contamos con equipos de prueba de presion, y laboratorios a gran escala y equipos de ensayo no destructivos