Opis produktu

Podstawowe informacje

Typ Compound Exhaust Valve Głoska bezdźwięczna Ciągliwy metal
Orzecznictwo CE, ISO9001,BV Big and Old Valve Facotry 65 Historia produkcji
Rozmiar DN200 OEM&ODM Prośba klienta
Powłoka Epoksyd Ciśnienie PN16
Norma projektowa En1074-4 Applicable Size DN25-DN300
Korpus zaworu Odlew Standard API609/DIN3354/BS5155/En593
Materiał korpusu Ductile Iron/Wcb/Stainless Steel Uszczelka Eksportuj pudełko ze sklejki
Testing 100% Inspections Before Leaving Factory Gwarancja 18 Miesiące
Pakiet Transportowy Eksportuj pudełko ze sklejki Trademark TWT

 

Opis produktu

Twt Factory Supply Ggg50 DN200 Pn10 Air Release Valve

The features of exhaust air relief valve
1.Exhaust process more smoothly
steady air release can avoid pressure surge and protect pipline damage

2.More autonomous working mode
The air relief valve can release air when filling water in pipe,enter air to get rid of negative pressure when vacuum or negative pressure exists

3.More reliable way of discharge
Quick released air and air with water will not close valve orifice in advance and cause air seal,Orifice will close when air is released completely

4.Automatic protection safer performance
Whenever if system pressure is lower than atmosphere ,water column happened,the air relief valve will open immmediately and air will enter system to get rid of negative pressure,at the same time,entering air can speed up the speed of air release during air release

Parametry produktu

TWT Exhaust air relief valve can be devided in to
High speed compound air release valve
Slow closing inlet and outlet air relief valve

Rozmiar:DN25-DN300
Ciśnienie:PN1.0-1.6Mpa
Temp:0ºC-90ºC
Main materials:żeliwo,ciągliwy metal,Stal nierdzewna
Connection type:Thread,Flang

Inspection and maintenance program

Close cut-off valve under air release valve
Take off the connection bolts between valve body and cover use water to clear floaing ball ,body,cover,sealing ring and creen
The floating ball is put back in place,install the valve cover,tighten the bolts
Open the cut-off valve

Installation and maintenance

Valve should be installed vertically in the pipeline highest point
The cut-off valve(butterfly valve or gate valve) should be installed before air release valve
Check and maintenance is recommened for one or two times in one year,the work can increase according to water condition

Main materials

Screen cover SS304/SS316
Screen Stal nierdzewna
Sealing NBR/EPDM
Retainer Stal nierdzewna
Float ball Stal nierdzewna
Cushion NBR/EPDM
Guide pin Stal nierdzewna
Ciało Ductile iron/WCB/Stainless steel
Cover Ciągliwy metal
Gasket NBR/EPDM
Leverage bracket Stal nierdzewna
Air-vent Stainless steel/brass
Floating ball lever Stal nierdzewna
Connectiontube Stal nierdzewna

 

Orzecznictwo

 

Nasze atuty

• Więcej niż 60 lat doświadczenia w produkcji zaworów
• z zaawansowanym sprzętem do przetwarzania
• duże laboratoria badawcze
• i wystarczające rezerwy surowców

Często zadawane pytania

Pytanie 1. Czy jest to fabryka?
A:tak, od tego czasu jesteśmy producentem zaworów 1956 mieć więcej niż 60 lat doświadczenia w produkcji zaworów
Pytanie 2. Czy mogę mieć własny, spersonalizowany produkt??
A:tak, masz niestandardowe wymagania dotyczące standardu,rozmiar,kolor,uszczelka,tabliczka z nazwiskiem,ocena,itp
P3. Czy dostarczasz próbki?
A:tak, możemy dostarczyć próbki, ale nie płacimy za fracht
Pytanie 4. Jakie są Twoje warunki płatności?
A:30% z góry 70% saldo przed wysyłką
Pytanie 5. Czy jest jakiś sprzęt testujący?
A:Tak, posiadamy sprzęt do prób ciśnieniowych, oraz duże laboratoria i sprzęt do badań nieniszczących